ADMIE Public Consultation on maximum power thresholds and the amendment of the connection requirements of power plants

20 December 2024

Joint response by EUGINE and EUROPGEN to the Greek grid operator ADMIE consultation on the amendment of the maximum power thresholds for determining the importance of power plants and the amendment of the connection requirements of power plants.

Download the publication